Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the revisionary domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the formidable domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-migration domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114
Concept Design stage balcony advice | Sapphire Balconies
Contact

Concept

We provide solutions. the most effective solution is one that works well in various aspects of performance whilst cutting out waste and unnecessary costs. Being involved in the concept design stage can help create simplistic solutions reflecting the vision yet avoiding costly and tricky details. Anchor spacing alone has saved £100,00o’s off some schemes.

In order to better understand your project and integrate our innovative Cassette Glide-On balconies seamlessly into the building, we believe it is essential to be involved in the project pathway as early as possible.

By taking this collaborative and supportive approach we can guarantee our balconies will be Rigid, Ready, Right.

That’s why we offer support which can really make a difference right from the early parts of the pre-construction process.

This includes:
  • CPD presentations & technical support. We share our expertise and years of learning to give attendees guidance in understanding regulations, approaches to tackle common issues and innovations to simplify and speed up the installation.
  • Interface solutions. There are many interfacing challenges which we will help tackle from casting in brackets through to final finishing.
  • Pre-construction concept design refinement. We will review designs and suggest potential enhancements, refinements or concerns and suggest solutions and ideas or value engineering.
  • We support clients in making decisions by providing standard samples and can also produce full project-specific balconies and mockups.
  • 2D, 3D and BIM. We can assist with providing early-stage concept design drawings of balconies in 2D or 3D CAD or as BIM Components.
  • Structural Calculations. Sapphire uses a bespoke SES (Structural Evaluations Systems) to check structural calculations and can also do FEA modelling to enable good design decisions to be made.
  • Install sequencing. Often projects have challenging and conflicting demands on programs, e.g. crane availability. We can assist with the sequencing of the balcony install and often good sequencing can be achieved by using unique installation equipment, e.g. hoists, counterbalances, etc.

Design

There are big advantages to using standardised design. At Sapphire, we have created our Cassette® system on the principle of...

Find out more

On Site Support

We support on-site installation teams initially with training, then supply them the unique specialist equipment they need for their specific...

Find out more