Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the revisionary domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the formidable domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-migration domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114
Malgavita, Merrick Road | Sapphire Balconies
Contact

Malgavita, Merrick Road

Client:   Redrow Homes (West London) Limited

Contractor:   Redrow Homes (West London) Limited

Architect:   Boon Brown Architects

Location:   Southall, Middlesex

Balconies:   92

Download full case study

Download

“Sapphire’s level of design is great. It’s so reassuring to know that everything has been thought of before the product arrives on site.”

Gary Wales, McKean

History

Southall’s local factories and proximity to Heathrow Airport meant that in the 1950s, the once-small town experienced a boom in popularity. This brand new development is situated just a stone’s throw from the pristine Southall station of the Elizabeth Line, Malgavita (currently known as The West Works) is a collection of 2-bedroom apartments, fitted with Sapphire’s cantilever Glide-On Cassette® balconies.

Challenge

Maglavita, Merrick Road, as a project, moved slower than expected so balconies were sent as needed. The project was being developed just as the MyDek Non-Combustible board came out, meaning that balconies that had been specified with Class C decking needed to be changed over to Class A MyDek on-site post-installation, as well as changing the balconies already in production.

Solution

Working closely with MyDek, the client and the installer was paramount to getting Malgavita finished on time and to the new specifications set out by the installer. Changing the decking over to the new Class A Non-Combustible range whilst facilitating Client install dates was a key solution for this project. Changing the decking over the last minute meant that Sapphire could ensure a level of proactiveness to ensure safety on the project for not just the client but for the end user too.

Get in touch

Contact us with your project details via our easy online form.

Contact us today

Case Studies