Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the revisionary domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the formidable domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-migration domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114
Upton Park Block F & G Case Study - Sapphire Balconies
Contact

Upton Park Block F & G

Client:   Barratt Homes

Contractor:   Dantaag

Architect:   Goddard Manton Partnership

Location:   Upton Park, London

Balconies:   203

Download full case study

Download

Upton Park is a well-known area of London once home to the West Ham football stadium formerly known as the Boleyn Ground. This development is situated just minutes from Upton Park tube station and a short journey from bustling central London.

Challenge

As planning had already been approved for the project the balcony design had to be kept in line with the original drawings.

Speed of install was very important because the balconies used previously elsewhere on the scheme had been particularly slow to install.

Solution

To keep in line with the details of the planning permission soffits were excluded resulting in a unique design to the underside of the balconies.

The speed of install was very important to this project as balconies elsewhere on the scheme had been slow to install. The balconies arrived prefinished ready to Glide-On™ to pre-erected support arms quickly and easily. Some were installed in as little as 6 minutes making the programme on site much quicker and more efficient.

Our Rigid.Ready.Right. guarantee was highly commended by Barratt East’s MD who was thrilled to receive a goodwill guarantee refund and who said they were very pleased with the product and service.

Installation Process

Step 1: Schoeck anchors were cast into the slab

Step 2: Cassette® balconies were preassembled offsite, including the balustrades & decking.

Step 3: Cassette® balconies were transported on lorry trailers with a custom lorry plan to optimise efficiency. Balconies were pre-slung offsite ready for installation upon arrival.

Step 4: Once lifted into position, the Cassettes® simply Glide-On™ to the pre-erected support arms, before completing the simple mechanical fixings.