Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the revisionary domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the formidable domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-migration domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114
Greenwich Millennium Village Phase 5 - Sapphire Balconies
Contact

Greenwich Millennium Village Phase 5

Client:   Bennett Construction

Contractor:   Bennett Construction

Architect:   Jestico Whiles & Associates

Location:   Greenwich, London

Balconies:   71

Download full case study

Download

Greenwich Millennium Village is a joint venture between developers Countryside and Taylor Wimpey, in association with the Mayor of London. This multi-phase development will create up to 3,600 new homes and mixed-use real estate on the Greenwich Peninsula, alongside its very own ecological park. We were invited by Bennett Construction to work with Jestico Whiles & Associates to design, manufacture and supply 71 Glide-On™ balconies for phase 5 of Greenwich Millennium Village, which had its own individual character.

The Wider Project

Greenwich Millennium Village is the first of the government’s Millennium Communities. This initiative set out to construct seven new ‘villages’, which are intended as models for 21st-century community living. Greenwich Millennium Village, which is located at the southern end of the formerly industrial 300-acre Greenwich Peninsula, is also part of the extensive Thames Gateway regeneration project. Currently, it is considered to be one of the largest regeneration projects of its kind in London.

Sustainability and inclusivity are at the heart of the project, creating eco-friendly homes for the existing and growing community in Greenwich. The developers and architects combined innovative design, construction and planning to create a variety of housing types and tenures alongside excellent amenities and green spaces. This gives a vibrant, mixed community everything they need to thrive, from schools and play areas to an IMAX cinema, all within walking distance.

Greenwich Millennium Village Phase 5

We worked on phase 5 of the Greenwich Millennium Village development, which included four new, independent blocks consisting of 62 apartments, 11 maisonettes and 23 affordable homes. The new phase also consists of 16 new townhouses ranging from two to four storeys. The entire development was built according to the Code for Sustainable Homes, Level 4, ensuring that the development works alongside the ecological park to restore nature to this former industrial site.

The Challenge

Each building in the Greenwich Millennium Village development has its own unique character. The balconies were a particular feature of this new phase, giving apartments an attractive, valuable patch of outdoor space. However, the principal challenge of the GMV phase 5 development was the delivery time. During construction, the project programme was shortened so the development could be completed ahead of schedule. This meant that the balconies had to be delivered quickly and efficiently, without compromising on precision and quality control.

The Solution

In this scenario, our design and offsite manufacture capabilities were integral to the project’s success. After the confirmation of the reduced deadline, we were able to manufacture, prepare and store the balconies at our offsite location. This meant that the complete balconies could be delivered efficiently and to time while saving the client storage space onsite. Meanwhile, our Glide-On™ Cassette balconies could be installed rapidly and easily once delivered.

Step 1: Anchors were cast into the slab and incorporated thermal break connections, offering superior rigidity to the balconies.

Step 2: Cassette® balconies were preassembled offsite, including the balustrades, decking and soffits.

Step 3: Cassette® balconies were transported with balconies ‘nested’ onto each pallet making transport both cost-effective and safe. Balconies were pre-slung offsite ready for installation upon arrival.

Step 4: Once lifted into position, the Cassettes® simply Glide-On™ to the pre-erected support arms, before completing the simple mechanical fixings.

The Results

Thanks to our storage and logistical capabilities, we were able to deliver the project to time, even in light of the reduced deadline. Furthermore, the ease of installation meant fitting the balconies was swift and hassle-free. This quick turnaround was achieved without compromising on quality – Sapphire’s balconies twice the rigidity specified in the British Standards and beautifully finished. The result was an attractive addition to these characterful contemporary apartments, adding yet more desirable yet affordable real estate to the Greenwich Millennium Village.