Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the revisionary domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the formidable domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-migration domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114
Green Man Lane Phase 3 - Sapphire Balconies
Contact

Green Man Lane Phase 3

Client:   Rydon Construction

Contractor:   Rydon Construction

Architect:   Gibberd Limited

Location:   West Ealing, London

Balconies:   84 balcony lifts

Download full case study

Download

History

Green Man Lane, Phase 3, marks a continuation and evolution of a residential development that not only adjoins but also distinguishes itself from the earlier phases of the project. Situated in a dynamic urban environment, this phase was designed to seamlessly connect with the architectural and community fabric established by its predecessors, yet introduce its own unique style. Despite the cohesion with past phases, the development team encountered new regulatory challenges that threatened to disrupt the project’s continuity. The updated ‘Part B’ Fire regulations in the UK, following the Grenfell tragedy, introduced stringent requirements that inadvertently complicated the use of glass in balcony designs by omitting laminate glass from the exemption list for facades.

Streamlined by Collaboration, Delivered by Sapphire

Sapphire Balconies, having been instrumental in the balcony designs of the earlier phases, was once again approached to devise a solution that aligned with the new fire safety standards without compromising the aesthetic and functional integrity of the development. The primary challenge was to create balconies that would comply with the A2-s1, d0 fire rating required by the updated regulations while ensuring that the balconies did not feel detached from those in the adjacent phases.

Leveraging its expertise and innovative approach, Sapphire transitioned from the initially planned glass balustrades to a railing system that met the requisite fire rating. This pivotal adjustment ensured that the balconies remained fully compliant with the new fire safety standards. Despite this change in material and design, Sapphire maintained the Cassette approach, along with the drainage trays and decking used in previous phases, ensuring a coherent visual and functional link across the development. This strategic adaptation allowed Sapphire to provide a fully A2-s1, d0 fire-rated balcony solution that harmonized with the established aesthetic of Green Man Lane, effectively navigating the regulatory landscape without sacrificing design continuity or buildability.

Through close collaboration with the architects and contractors, Sapphire Balconies demonstrated their commitment to innovation, safety, and design excellence. The successful integration of the new railing system into Phase 3 of Green Man Lane stands as a testament to the ability to overcome unforeseen challenges while maintaining the essence and integrity of a multi-phase residential development.