Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the revisionary domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the formidable domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-migration domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stag_leaf/public_html/wp-includes/functions.php on line 6114
Cooldown Commons (Citywest Phase 3) - Sapphire Balconies
Contact

Cooldown Commons (Citywest Phase 3)

Client:   Cairn PLC

Contractor:   Cairn PLC

Architect:   Reddy Architecture & Urbanism

Location:   Tallaght, Dublin

Balconies:   335 balconies

Download full case study

Download

“Well ahead of the programme and going well. Working with Sapphire as a company has been a good experience. Our next project will be using Sapphire Balconies, and I’m looking forward to working with you again.”

Project Director, Cairn PLC

History

Tallaght is the largest county town of South Dublin and one of the largest settlements in the area. Tallaght has seen a rise in modern development since the late 1960s, with cutting-edge arts centres and amenities all within reach of brand-new residential developments. One of these new developments, Cooldown Commons (previously known as Citywest Phase 3), features 335 of Sapphire’s innovative balconies.

Streamlined by Experience, Delivered by Sapphire

Sapphire worked closely with Cairn PLC to deliver on their aspiration of building a sustainable yet cost-effective series of balconies for the Citywest project. Meeting the two requirements can often take time and concessions have to be made, but Sapphire was able to meet the brief without needing to reduce quality in aesthetics, structure or sustainability.

Cairn worked from an early stage with Sapphire. We were able to streamline the balcony journey by using our experience in the balcony industry. We brought the aspirations of cost-effectiveness and sustainability together, taking the weight off the balcony structure. Creating a lightweight balcony meant needing fewer connections to the building. In turn, both operational and embodied carbon were reduced.

Lightweight balconies don’t lose anything in rigidity, however. We work to less than half of the allowed deflection stated in EU standards, meeting a minimum of L/360 deflection.

Get in touch

Contact us with your project details via our easy online form.