Green Man Lane
Client: Rydon Construction/London Borough of Ealing
Contractor: Rydon Construction
Architect: Frederick Gibberd
Location: Ealing, West London
Balconies: 117 Cassette® Balconies
Download full case study
DownloadChallenges at Green Man Lane
Needing to maintain the aesthetic appeal of Green Man Lane from the initial phase but with an upgrade, the client, Rydon Construction, needed a leading balcony provider that could supply a range of balcony types, including projecting and inset balconies with different balustrades, that would still blend seamlessly with previous phases whilst meeting privacy and drainage requirements.
Solution
Our Cassette® balconies combined the requirement for a range of projecting and inset balconies, which were positively drained, whilst still meeting the rapid install deadlines and privacy requirements. With a mix of balcony components, including opaque glass and end boxes, Sapphire was still able to maintain the aesthetic feel that encompasses Green Man Lane.
Installation process
Step 1: 350 one piece M30 anchors were cast-in with the slab and incorporated the thermal break connections offering superior rigidity to the finished balconies.
Step 2: Preassembled Cassette® balconies are manufactured and stored at our Thetford production and secure storage facility.
Step 3: With the balcony production being off-site, balconies were delivered ready for the install team to complete lift into place and secure.
Step 4: Once lifted into position, the Cassettes® simply ‘glide’ on to the pre-erected brackets, before completing the simple mechanical fixings.